The Alabama DOT changed the flow of traffic at US Highway 80 and Alabama Highway 17 this past week.  Traffic was swapped to the newly constructed bridge and lane while the old lane and bridge are repaired before being reopened.  The intersection is well marked, but will be confusing to any who were used to the old intersection.  Caution should be exercised when crossing the highway at this location.

Photos – J. Hughes